Premium Aerotec Augsburg
New administration building
Task
- Architecture, structural and TGA planning, as well as fire protection concept
- General planning of an engineering center (HAOI service phases 1 to 8)
- Volume: 4.8 Mio €
Requirements
- Concept development in close coordination with different users and implementation in close coordination with all project participants
- Awarded to general contractors for interface reduction and implementation under high time pressure
Customer benefits
- Conceptual design of different office concepts for the innovation and development building
- Multifunctional areas
New plant I
Task
- New plant I for the production of components (lightweight half-shells) for the production of the Airbus A350
- General planning in service phases 5 to 8 (HOAI)
- Volume: 16 Mio €
Requirements
- Transfer of the existing pre-planning (LPH1-4) and short-term implementation in work planning and functional description to find a general contractor
- Construction supervision or site management in the construction office on site
Customer benefits
- Close coordination with the client’s representative, short-term change management on the construction site
Expansion of plant I in Hall 110a/120a
Task
- Expansion of plant I to increase the production capacity of the Airbus A350
- General planning in service phases 1 to 8 (HOAI)
- Additions in reinforced concrete in the north and in steel construction in the south (large spans (>65m) of the existing production hall
- Volume: 13 Mio €
Requirements
- Concept development and implementation with general contractor due to the short time frame and tight budget
- Site supervision or site management in the site office
- Build during operation without downtimes
Customer benefits
- Completion despite tight time and budget “in cost and in time”
- Short-term processing of change and adjustment requests